MEP coordination support
Clash checked mechanical, electrical and plumbing coordination that keeps every system resolved before it hits site.

- Mechanical
- Electrical
- Plumbing
What you send.
What you get back.
Send what you have. We tell you if anything is missing before we quote.
You send
- Current discipline models
- Approved coordinates and federation protocol
- Clash rules and tolerances
- Responsibility and issue approval matrix
You get back
- Federated review model
- Coordination views
- Issue register or BCF package
- Status and handoff report
How it is checked
- Federation uses the named model versions and agreed coordinate basis
- Every routed item carries traceable evidence, ownership and status
- Retested closures reference an approved source model revision
- Client discipline leads accept the reported coordination status
A clash report you can act on.
This is a real test, run on a house we modeled: structure against mechanical, electrical and plumbing. Every clash comes back with the two elements, where it is, how deep it goes and a picture.
- 54structural elements
- 160service elements
- 9clashes over 12 mm
- 5touches filtered out



| No. | Structure | Service | Overlap | Height above lowest point |
|---|---|---|---|---|
| C01 | FramingFloor Wood Joist 10" Existing Wood Floor | VentilationWall Vent 9"H X 14"W | 61 mm | 5.17 m |
| C02 | FramingFloor Wood Joist 10" Existing Wood Floor | VentilationWall Vent 9"H X 14"W | 61 mm | 5.16 m |
| C03 | FoundationsExterior 6" Concrete stem wall | VentilationWall Vent 4"H X 12"W | 30 mm | 4.97 m |
| C04 | FoundationsExterior 6" Concrete stem wall | VentilationWall Vent 4"H X 12"W | 30 mm | 4.97 m |
| C05 | FoundationsExterior 6" Concrete stem wall | VentilationWall Vent 4"H X 12"W | 30 mm | 4.96 m |
| C06 | FoundationsExterior 6" Concrete stem wall | VentilationWall Vent 4"H X 12"W | 30 mm | 4.97 m |
| C07 | FoundationsExterior 6" Concrete stem wall | VentilationWall Vent 4"H X 12"W | 30 mm | 4.99 m |
| C08 | FoundationsExterior 6" Concrete stem wall | VentilationWall Vent 4"H X 12"W | 30 mm | 5.00 m |
| C09 | FoundationsExterior 6" Concrete stem wall | VentilationWall Vent 4"H X 12"W | 30 mm | 5.00 m |
On your project the same list goes back to each trade with an owner and a due date, and is run again after every model update until it is empty.

Is this for you?
Who it is for
- MEP and multidisciplinary engineering consultancies
- Architecture or delivery teams coordinating consultant models
- Developers managing a client led federation and review process
When it helps
- Coordination mobilization and federation setup
- Design development and interdisciplinary review
- Preissue coordination status and structured handoff
How we work together
- Federation and issue management support under discipline leads
- Defined coordination zone, system, package or review cycle
- Backlog rationalization and closure status support
You approve the scope and price before any work starts.
Clear brief.
Checked work.
Clean handoff.
Send your brief
Drawings, references and your deadline. A sketch or a PDF set is enough to start.
Get a clear quote
We reply within one working day with scope, price, timeline and the number of revisions included.
Review every stage
Work arrives in stages. Each one is checked in house first, and nothing moves on until you approve it.
Receive your files
Native Revit, 3ds Max or Blender files, drawings and final images. They are yours to keep and reuse.
We work through Upwork and Fiverr, so the platform holds your payment until you approve the work. How hiring works
The detail, when you need it.
Standards, formats, review points and who stays responsible.
Information baseline
Create a traceable coordination layer that helps discipline leads review, assign and close production issues earlier.
Required inputs
- Current discipline models
- Approved coordinates and federation protocol
- Clash rules and tolerances
- Responsibility and issue approval matrix
Naming and controls
- Discipline/model naming, coordinates, levels and federation origin
- Issue identifier, location, system, priority, owner and due date fields
- Model version, review run and issue status conventions
- Named discipline lead for every decision bearing issue
Standards and constraints
- Client issued clash rules, tolerances, exclusions and priority classes govern checks
- Automated intersections are rationalized before issue routing
- Axys3D records and supports actions but does not decide engineering resolution
- Only client authorized model revisions are retested as proposed closures
Verified software and formats
- Revit and IFC discipline models where issued as approved inputs
- NWC/NWD packages for agreed federation workflows
- BCF packages or project agreed issue registers
- PDF coordination views and reports where required for review
Scope and gates
Axys3D progresses work against named inputs. Design bearing decisions and approvals remain client led.
Technical scope
- Model federation and alignment checks
- Rule based clash review support
- Issue grouping, ownership and status tracking
- Coordination views and meeting outputs
Validate model versions and coordinates
Review gate: Federation gate: versions, coordinates and model coverage accepted.
Federate approved discipline packages
Review gate: Rules gate: test set, tolerances, exclusions and priority accepted.
Run agreed checks and rationalize findings
Review gate: Issue gate: discipline ownership and required response confirmed.
Issue items to responsible discipline leads
Review gate: Closure gate: authorized discipline lead approves the resolution instruction.
Track client approved closures and retest
Review gate: Handoff gate: open, closed and deferred status acknowledged.
Delivery definition
Deliverables
- Federated review model
- Coordination views
- Issue register or BCF package
- Status and handoff report
Acceptance criteria
- Federation uses the named model versions and agreed coordinate basis
- Every routed item carries traceable evidence, ownership and status
- Retested closures reference an approved source model revision
- Client discipline leads accept the reported coordination status
Structured handoff
- Versioned federation package
- Open/closed issue record
- Decision and assumption log
- Client accepted coordination status
Evidence required
- Written scope approval
- Current source information register
- Named client approvers
- Approved publication evidence
Responsibility boundary
No licensed engineering design, clash resolution authority, code certification or professional sign off is claimed.
Axys3D provides production, modeling, coordination or delivery support as scoped. It does not act as architect or engineer of record and does not provide statutory sign off.
Connected delivery
Related services
Buyer specific routes
Technical FAQ
Do you resolve clashes?
We support identification, routing, model updates against approved instructions and retesting. Resolution authority remains with client authorized discipline leads.
Which formats can be federated?
Typical workflows use Revit, IFC, NWC/NWD and BCF, confirmed per project.
Is this licensed MEP design?
No. The service is coordination and production support, not licensed engineering design.
What qualifies an issue as closed?
An authorized discipline lead approves the resolution instruction, the correct source model revision is retested and the client accepts the recorded status.
Coordination protocol
Bring the intended use, available source information, review owners, milestones and required handoff.
Send us your drawings.
A sketch, a PDF set or a Revit model is enough to start. We reply within one working day with a clear scope, price and timeline.
No commitment. We sign your NDA before you share files.